The parts of the hair transplanter generally appear at the bend or cone of the horizontal section, especially at the bend where the horizontal section is connected to the vertical pipe. For the treatment method of pipe blockage, reverse pump dredging should be carried out first,Brush Machine and other personnel hit the pipe blockage area with a hammer. If the elimination of the blocked pipe is invalid, first close the hydraulic gate valve. After the pressure is released, remove the concrete in the blocked pipe, connect the pipeline, open the hydraulic gate valve and continue pumping.
It usually appears in the pipe near the outlet end of the tufting machine,Brush Machine especially at the bend where the horizontal section is connected to the vertical pipe. Treatment method: Close the hydraulic gate valves at the vertical and horizontal pipes and replace the pipes. Precautions: Use an infrared thickness gauge to regularly detect the thickness of the conveyor pipe in the horizontal section and vertical initial section, and replace it if the thickness is less than 4mm.
For different weight components, Brush Machine different types of steel ropes should be used, and small ropes are prohibited from lifting large objects. At the same time, a regular inspection system for steel ropes and a visual inspection inspection system before each lifting should be established. Marking, such as marking the qualified steel rope with blue in the first inspection and green marking the steel rope with qualified in the second inspection, etc.,Brush Machine and unqualified steel ropes such as loose strands, broken strands, exposed core, and burrs exceeding Wire ropes for safe areas etc. are marked in red and obsolete.
The maintenance content of the hair transplanter equipment generally includes daily maintenance, Brush Machine regular maintenance, regular inspection and precision inspection. Equipment lubrication and cooling system maintenance are also an important content of equipment maintenance. The daily maintenance of equipment is the basic work of equipment maintenance and must be institutionalized and standardized. For the regular maintenance of equipment, work quotas and material consumption quotas should be formulated and evaluated according to the quotas. The regular maintenance of equipment should be included in the assessment of the workshop contract responsibility system.

