What inspection items need to be done during the operation of the spring machine? The user of the spring machine must be familiar with the structural performance of each part of the equipment, each solenoid valve, Spring Machine stroke switch and the keys on the operation panel, the role of the indicator light and the working cycle of the machine , Can not be used for super performance.
New machines or machinery after overhaul must be run-in maintenance during the run-in period. For example, when the universal spring machine is used within the specified running-in period,Spring Machine it is necessary to increase the load and speed step by step according to the corresponding regulations, and to comprehensively check the lubrication and tightening conditions, observe the status of each part of the machine, and find the abnormalities in a timely manner. The key points of running-in maintenance are to replace lubricants, lubricate parts and tighten bolts.
When the system is powered on, a half-hour dry run is required to allow the system to stabilize before it is officially put into operation. Put the transfer switch in the idling gear position and check whether the runnable light is on. If there is a problem, wait until the fault is removed before turning it on.
The replacement of the spring machine is what many companies need to do at present. Many spring machine manufacturers are using some older mechanical equipment for production. In this case, Spring Machine not only is the efficiency very low, but also the quality of the product cannot keep up.